Field development solution
The field will be developed with three wells and an 80-kilometre tie-back pipeline to the Aasta Hansteen platform. As the only planned deepwater development in Norway (in 1350 metres of water), the technical solution will enable new deep and cold-water developments elsewhere.
A newly-developed insulated pipe solution will be used for the pipeline to Aasta Hansteen, due to the extreme cold on the seabed. This innovation employs a swaged pipe-in-pipe design with a combination of insulation and vacuum between the inner and outer pipes, together with monoethyleneglycol (MEG) injection to reduce the formation of hydrates in the multi-phase well stream.
The gas from Irpa will be phased into existing infrastructure over Aasta Hansteen and transported via Polarled to the Nyhamna processing plant. From there, gas is transported via the Langeled pipeline system to customers in the UK and continental Europe.
The partners in the project are Equinor (operator), Wintershall DEA, Petoro, and Shell.
The field is expected to come on stream in 2026.