Reducing emissions from the Troll field
(UTC)
On Saturday, 7 September, Troll B and C became partly powered from shore. This reduces annual emissions from the Norwegian continental shelf (NCS) by 250,000 tonnes of CO2.
Facts
- The licensees in Troll Unit are Equinor 30.6% (operator), Petoro 56%, A/S Norske Shell 8.1%, TotalEnergies 3.7% and ConocoPhillips Skandinavia AS 1.6%.
- Aker Solutions AS has built three electro modules at its Stord yard and been responsible for the procurement and installation of all electrical equipment in the modules and in the new electro building at Kollsnes.
- In addition, Aker Solutions has been responsible for all modification work on Troll B and C and all hook-up to existing operating systems both offshore and at Kollsnes.
- Heavy lifts of modules were performed by Heerema.
- For the Kollsnes sub-project, the main supplier is Skanska Norge AS, responsible for constructing the transformer substation and landfall area.
- Total investments in the project are NOK 8.1 billion.
- Aker Solutions’ contract is worth about NOK 2.9 billion, generating about 1000 person-years (FTE) of employment.
- The module fabrication took place at the Stord yard. Aker Solutions estimates that 4000 people were involved in the work.
- NKT has been responsible for the production and installation of the power cable. NKT’s contract is worth NOK 1 billion. The cable production was carried out at NKT’s facility in Karlskrona, Sweden.
- Skanska Norge AS’s contract is worth around NOK 370 million and generated about 100 person-years of work (FTE) for Skanska and sub-contractors in the project period.
- The power demand for Troll B and C will be up to 116 MW after full electrification of Troll C.