skip to content

Impact assessments

  1. Home
  2. Sustainability
  3. Impact assessments

The impact assessment process is an integral part of the overall risk management process in Equinor.

Our requirements for impact assessments are based on national requirements in the countries we operate and guidance as set out in international standards.

Disclosure of information and an open dialogue with potentially affected communities and other stakeholders are key elements in the impact assessment process. Recognising that different countries have different procedures and routines for involving stakeholders, our ambition is to comply with national requirements and to apply best practice as described in international standards.

In joint ventures and in partner operated projects, we endeavour to promote Equinor’s principles for impact assessment as a tool for managing environmental and social impacts in project performance.

Our impact assessments are published in PDF format below and may be downloaded freely. They are normally published in their original language only.

Please note: reports relating to our Norwegian projects are therefore only available in Norwegian.

Aasta Hansteen, NCS

Aasta Hansteen er et gass- og kondensatfelt lokalisert i blokk 6607/1, 6706/12, 6707/10 og 6707/12 i Norskehavet omlag 140 km nord for Norne og vel 300 km vest for Bodø.

Alfa Sentral, NCS

The Alfa Sentral gas and condensate field is located in Blocks 15/8 and 16/18a in the central North Sea, about 20 km vest of the Sleipner complex.

Alfa Sentral environmental statement (PDF)

Barnacle, UK

Barnacle is located south of the Statfjord field in the North Sea.

Environmental statement Barnacle field June 2019 (PDF)

Bitumen, Alberta, Canada

Bitumen impact assessment

Block 38 and 39 Exploration, Angola

Block 38 and 39 is located in Kwanza in Angola.

CAN_100, CAN_108 and CAN_114 blocks, Argentina

CAN_100, CAN_108 and CAN_114 blocks, Argentina impact assessments

CO2 Highway Europe

CO2 Highway Europe er et infrastrukturprosjekt for transport av større mengder CO2 fra kontinentet til norsk sokkel for permanent lagring i egnede geologiske lagringsreservoarer på norsk kontinentalsokkel. Rørledningssystemet vil ha startpunkt i henholdsvis Zeebrugge i Belgia og Dunkirk i Frankrike, og vil i varierende lengder krysse og berøre belgisk, fransk, nederlandsk, tysk, dansk og norsk økonomisk sone og jurisdiksjon, totalt 6 nasjoner.

Rørledningen fra Zeebrugge i Belgia til endepunktet på norsk sokkel er om lag 1.050 km lang, med om lag 505 km i norsk del av Nordsjøen.

Transportsystemet planlegges med en transportkapasitet på i størrelsesorden 18-27 millioner tonn CO2 per år, med en planlagt oppstart av drift i 2030.

Det vil bli utarbeidet separate konsekvensutredninger for hvert land som rørledningen omfatter.

Program for konsekvensutredning

Dudgeon and Sheringham Extension Projects

The Crown Estate has opened up for applications to extend operating offshore wind assets in England and Wales.

The Dudgeon Extension Project (DEP) is a project with total installed capacity up to 402 MW and is located north and southeast of the operating Dudgeon Offshore Wind Farm.

The Sheringham extension Project (SEP) is a project with total installed capacity up to 317 MW and Is located north of the operating Sheringham Shoal Offshore Wind Farm.

Both extension projects have secured a grid connection to the existing grid at Norwich Main substation in Norfolk.

Equinor Canada Offshore Exploration Drilling Program

Environmental Assessment Conditions Information

Europipe II

Europipe II is a pipeline for transportation of natural gas from Kårstø in Norway to Dornum in Germany.

Firefly floating offshore wind farm project in Ulsan, South Korea

The Firefly project plans to develop and construct an 800 MW floating offshore wind farm about 70 km off the coast of Ulsan. Equinor has received an EBL from the Korean government for the Firefly project back in early December 2021.

Gina Krog & Eirin, NCS

Gina Krog (tidligere Dagny) er et olje- og gassfelt lokalisert 30 km nordvest for Sleipner. Gassfeltet Eirin ligger 9 km nordvest for Gina Krog. Feltene ligger innenfor produksjonslisensene PL048, PL303, PL029B, PL029 og PL048E i midtre del av Nordsjøen.

Gina Krog alternativ oljeeksport

Gina Krog feltet ser på en ny løsning for oljeeksport fra feltet med en ny direkte eksportrørledning til Sleipner A.

Løsningen som studeres er å ta i bruk eksisterende oljeeksport pumper på Gina Krog plattformen og pumpe oljen direkte til Sleipner via en ny 10‘’ rørledning på 24,8 km mellom Gina Krog og Sleipner A. Rørledningen vil bli koblet på den eksisterende rørledning som per i dag går mellom Gina Krog plattform og Gina Krog FSO. Oppkoblingspunktet er planlagt utenfor Gina Krog plattformens 500 meters sone. På Sleipner feltet vil oppkoblingspunktet av den nye oljeeksportrørledningen være mot eksisterende rørledning som går fra Sleipner Øst til Sleipner A.

Gjøa, NCS

Gjøa is an oil and gas field located in PL 153 in the North Sea. The distance from shore is 45 km. The Gjøa to FLAGS gas export pipeline is part of the Gjøa project. The pipeline extends into the UKCS.

Glitne, NCS

Glitne er et lite oljefelt beliggende i Sleipner-området, om lag 40 km nord-nordvest for Sleipner-feltet, nær grensen til britisk sokkel. Glitne-feltet tilhører produksjonslisens PL048 som ligger i blokk 15/5.

Glitne - konsekvensutredning juni 2000 (PDF)

Gudrun & Sigrun, NCS

Gudrun er et olje- og gassfelt i PL025. Sigrun vurderes utbygget som en integrert brønnrammestruktur knyttet opp mot Gudrun. Feltet ligger 10 km fra britisk sektor og 55 km nord for Sleipner.

Gullfaks & satellitter, NCS

Hovedfeltet i Gullfaks-området ligger i blokk 34/10 i den nordlige delen av Nordsjøen. Herunder ligger Gullfaks, Gullfaks Satellitter, Skinfaks og Rimfaks.

Haltenpipe

Haltenpipe er et transportsystem for gass fra Heidrun-feltet til anlegg for metanolproduksjon på Tjeldbergodden.

Gass fra Heidrunfeltet - anlegg for metanolproduksjon - konsekvensutredning september 1990 (PDF)

Heidrun, NCS

Heidrun is located in Haltenbanken on the Norwegian Continental Shelf, offshore Mid-Norway.

Heidrun Extension Project (HEP)

Heidrun olje- og gassfelt ligger på Haltenbanken i Norskehavet, omtrent 190 km fra land og 30 km nord-øst for Åsgardfeltet. Vanndypet i området er omkring 350 meter.

Heidrun gass eksport

Rørledning for eksport av gass fra Heidrun til Åsgard Transport.

Konsekvensutredning Heidrun gasseksport mai 1997 (PDF)

Huldra, NCS

Huldrafeltet er et gass- og kondensatfelt som ligger i den nordlige delen av Nordsjøen mellom Gullfaks- og Osebergfeltet i oljeblokkene 30/2 og 30/3. Feltet ligger omlag 125 km vest av utløpet av Sognefjorden og 16 km vest av Veslefrikk.

Hywind Scotland Pilot Park, Scotland

Hywind Scotland Pilot Park impact assessment

Karama block Indonesia

Statoil Indonesia Karama AS (Statoil) and partner Pertamina plan to undertake an exploration drilling program of three deep-water exploration wells at Karama Block in the Makasser Strait, offshore West Sulawesi Province in 2011.

The purpose of this project is to discover the oil or gas targets indentified from interpretation of 3D seismic survey data.

Karama block - impact assessment (PDF)

Kiwi, Egypt

The “Kiwi-A1X” well is located in the Mediterranean Sea, El Dabaa Offshore Concession in Egypt.

Kristin, NCS

Kristin er et gass- og lettoljefelt innenfor utvinningstillatelsene PL134B, PL199 og PL257. Feltet er lokalisert om lag 20 kilometer sørvest for Åsgard.

PUD Kristin - konsekvensutredning del 2, mai 2001 (PDF)

Kvitebjørn, NCS

Kvitebjørn er et gass- og kondensatfelt beliggende innenfor utvinningstillatelse PL193. Feltet ligger i Tampenkilen i nordre del av Nordsjøen om lag 20 km sørvest for Gullfaks.

Langeled pipeline, Norway—UK

Langeled is a 44 inch pipeline stretching from the Norwegian Sector near Sleipner (Block 22) of the North Sea to facilities at Easington on the UK coast.

Langeled OMay22-DTI environmental statement (PDF)

Mikkel, NCS

Mikkel er et gass- og kondensatfelt med en tynn oljesone innenfor utvinningstillatelse PL092. Feltet er lokalisert sør for Midgard-feltet.

Konsekvensutredning del 2 - Mikkel desember 2000 (PDF)

Morvin, NCS

Morvin er et olje- og gassfelt som ligger innenfor utvinningstillatelse PL134B, blokk 6506/11, i Norskehavet. Feltet ligger 21 km nord for Kristin og 15 km nordvest for Åsgard A.

Konsekvensutredning Morvin desember 2007 (PDF)

Norne & satellitter, NCS

Nornefeltet er et oljefelt beliggende innenfor blokkene 6608/10 og 6608/11 med en avstand på 85 kilometer til Heidrun-feltet. En rekke satellitter er tilknyttet Nornefeltet.

Norne gasseksport, NCS

Eksport av gass fra Norne til Åsgard Transport.

Konsekvensutredning Norne gasseksport - vedlegg PUD mai 1997 (PDF)

Nordsjøen 2006, regional konsekvensutredning

Nordsjøen 2006 impact assessments (in Norwegian)

Norskehavet 2003, regional konsekvensutredning

Norskehavet 2003 impact assessments (in Norwegian)

Rosebank oil and gas field

Rosebank is an oil and gas field 130 kilometres off the coast of the Shetland Islands.

Siri, Danmark

Siri-feltet ligger i blokk 5604/20 i den nordøstlige del av den danske sektoren av Nordsjøen og består av to strukturer, Siri Central og Siri Nord.

Siri - vurdering av virkninger på miljøet februar 1997 (PDF)

Sleipner Kraft fra land

Etableringen av en områdeløsning på Utsira høyden til forsyning av elektrisk kraft fra land mot feltene Johan Sverdrup, Edvard Grieg, Ivar Aasen og Gina Krog, har muliggjort en løsning til også å forsyne Sleipner A med kraft fra land, ved å maksimere utnyttelsen av kapasiteten i områdeløsningen.

Tilknyttingen til kraft fra land anlegget på Utsira høyden vil skje via Gina Krog plattformen, med en ny vekselstrømskabel fra Gina Krog til Sleipner A installasjonen. Planlagt oppstart av kraftleveranser fra land via Johan Sverdrup og Gina Krog er 4. kvartal 2022. PL046 Sleipner vil da kunne minimere egen kraftforsyning fra gassturbiner og dermed redusere sine tilhørende CO2 og NOx utslipp. For perioden 2022 til antatt brukstid 2032 er det estimert gjennomsnittlig reduserte utslipp på 150 000 tonn CO2 og 640 tonn NOx per år. Dette inkluderer leveranser av kraft fra Sleipner til Gudrun-plattformen, samt kraft til prosessering for tilknyttede felt til Sleipner-installasjonene.

Smeaheia

Smeaheia er et CO2 lagringsprosjekt (CCS).

Smeaheia omfatter transport, mottak og permanent lagring av CO2 i et geologisk reservoar mellom Trollfeltet og land i nordlige del av Nordsjøen.

Konsekvensutredningen omfatter et landanlegg for mottak, mellom-lagring og eksport av CO2 like sør for Sture-terminalen i Øygarden kommune i Vestland fylke, en rørledning og kombinert kraft- og fiberkabel til injeksjonsbrønner samt et geologisk reservoar på sokkelen for injeksjon og permanent lagring av CO2.

Program for konsekvensutredning

Snorre, NCS

Snorre er et oljefelt beliggende i blokkene 34/4 og 34/7 i den nordlige delen av Nordsjøen. Konsekvensutredningen er utarbeidet av Saga Petroleum.

Snøhvit & Hammerfest, NCS

Snøhvit-feltet er lokalisert på Tromsø-flaket i Troms I-området i Barentshavet, om lag 150 kilometer fra land. LNG-anlegget er lokalisert på Melkøya i Hammerfest i Finnmark, Norge.

Statfjord & Statfjord Late Life, NCS & UKCS

Statfjord & Statfjord Late Life, NCS & UKCS

Sygna, NCS

Sygna er et oljefelt beliggende innenfor utvinningstillatelse PL037 og PL089 om lag 21 kilometer nordøst for Statfjord C-plattformen.

Konsekvensutredning - Sygna - vedlegg til PUD november 1998 (PDF)

Timissit Block 201 Exploration, Algeria

The Timissit licence is an unconventional liquid-rich gas licence. The Timissit licence is located near the Libyan border on the edge of the Berkine basin, Algeria.

Environmental and social impact assessment - Timissit exploration project (block 210) Algeria - July 2015 (PDF)

Tommeliten Gamma, NCS

Tommeliten Gamma er lokalisert i blokk 1/9, sørvest for Ekofisk i Nordsjøen.

Konsekvensutredning - avvikling og disponering av Tommeliten Gamma juni 1997 (PDF)

Tordis, NCS

Tordis er et oljefelt med mindre mengder gass. Feltet ligger i blokk 34/7 i nordlige del av Nordsjøen, om lag 150 vest for Florø. Konsekvensutredningen er utarbeidet av Saga Petroleum.

Tordisfeltet - PUD- konsekvensutredning desember 1990 (PDF)

Troll, NCS

Troll-feltet ligger i nordre del av Nordsjøen, om lag 65 kilometer vest for Kollsnes i Hordaland. Feltet strekker seg over et område på 750 kvadratkilometer i blokkene 31/2, 31/3, 31/5 og 31/6 i Nordsjøen.

Tyrihans, NCS

Tyrihansfeltet ligger i Norskehavet, om lag 35 kilometer sørøst av Kristinfeltet og 170 kilometer fra land.

Tyrihans - plan for utbygging, anlegg og drift - del 2 konsekvensutredning mars 2005 (PDF)

Utgard

Søknad om godkjenning av oppfylt utredningsplikt for Utgard.

Utgard gass- og kondensatfelt er lokalisert i lisensene PL046E og PL046F i blokk 15/8 og P.312 i blokk 16/18 på UK side. Utgard ble oppdaget i 1983. Feltet har ligget uutviklet i påvente av ledig kapasitet på Sleipner-anleggene.

Utgard – Environmental Statement

The Utgard field is a trans-boundary gas and condensate field with a portion of the total reserves located on the UK side of the border.

The field is located in Blocks 15/8 (NCS) and 16/18a (UKCS) in the central North Sea, about 21 km west of the Sleipner complex. Utgard will be developed from a four slot subsea template with 2 wells, and a 21 km pipeline connecting the wells to the Sleipner T platform (SLT).

All processing will take place at SLT, and all the infrastructures will be placed on the Norwegian side of the border. Although one of the two well targets is on the UKCS, this target will be reached from the drilling location on NCS.

Utsirahøyden gassrørledning, NCS - SAGE

Eksportrørledning for gass fra Edvard Grieg installasjonen på norsk sokkel til SAGE (Scottish Area Gas Evacuation) rørledningssystem på britisk sokkel i Nordsjøen.

Utsirahøyden gassrørledning til SAGE-systemet i Storbritannia (PDF)

Valemon, NCS

Valemon er et gass- og kondensatfelt beliggende i PL193/PL050, mellom Kvitebjørn og Gullfaks Sør. Vanndybden i området er om lag 135 meter.

Vega, NCS

Vega ligger i nordre del av Nordsjøen i blokk 35/8 og 35/11 og består av tre felt kalt Camilla, Belinda og Fram B. Feltene ligger 10–30 km nord/nordvest for Framfeltene, 45–75 km nordvest for Troll og mellom Gjøa og Gullfaks.

Konsekvensutredning oktober 2006 (PDF)

Vestprosess, Norge

Vestprosess transporterer og prosesserer NGL og kondensat. Vestprosessrørledning knytter Kollsnes og Sture til Mongstad.

Vestprosess - konsekvensutredning november 1997 (PDF)

Vigdis, NCS

Vigdis er et oljefelt med mindre mengder gass og ligger i Tampen i blokk 34/7 i nordlige del av Nordsjøen, om lag 150 vest for Florø. Konsekvensutredningen er utarbeidet av Saga Petroleum.

Vigdis - PUD-konsekvensutredning oktober 2004 (PDF)

Visund, NCS

Visund er et kombinert olje- og gassfelt i Nordsjøen, beliggende omlag 130 kilometer vest nordvest for Sognefjorden.

Visund - konsekvensutredning PL120 september 1995 (PDF)

Volve, NCS

Volve er et oljefelt beliggende innenfor utvinningstillatelse PL046 blokk 15/9 omlag 8 km nord for Sleipner A-plattformen i Nordsjøen.

Yme, NCS

Yme utgjør utvinningstillatelse PL114. Feltet ligger i blokk 9/2 på Egersundbanken i Nordsjøen, om lag 110 km sørvest for Egersund.

Åsgard, NCS

Åsgard består av Smørbukk-, Smørbukk Sør- og Midgard. Feltene produserer olje/kondensat og gass. Feltene ligger på Haltenbanken i Norskehavet, om lag 200 km fra land og 50 km sør for Heidrun-feltet.

Åsgard Transport, Norge

Gassrørledning fra Åsgard-feltet i Norskehavet til Kårstø i Rogaland, Norge.

Åsgård Transport konsekvensutredning - alternativ trasé Kalstø til Kårstø november 1997 (PDF)